1381.001 COMPREHENSIVE STORMWATER MANAGEMENT PLAN.
   The post-construction water quality plan developed to meet this regulation will be coordinated and combined with the riparian and wetland setback plan and the construction site conservation plan that are developed for the same site. These plans will be titled and numbered in one consecutive sequence to make a comprehensive stormwater management plan for the site. The comprehensive stormwater management plan so developed will serve as the stormwater pollution prevention plan (SWP3) required by Ohio EPA as part of the NPDES stormwater permit for general construction.
(Ord. 2017-19. Passed 10-10-17.)