1148.07 SUBMISSION REQUIREMENTS; PLANS AND SUPPORTING DATA.
Any developer whose land is within a U-5 (HR) or U-5 (HR) MU Office Building High-Rise (Overlay) District shall submit a proposal to the Planning Commission for the establishment of a U-5 (HR) or U-5 (HR) MU use. Such proposal shall include the following:
(a) Survey. An engineer's survey of the property, including topography, indicating the ownership and acreage of the area proposed for development;
(b) Preliminary Site Development Plans.
(1) The location, size, height and orientation of all buildings;
(2) The proposed system of circulation for all vehicular and pedestrian traffic; and
(3) The arrangement and layout of all off-street parking areas and facilities.
(c) Traffic Study. Prepared by a professional traffic engineer, assessing the traffic impact of the proposed development on the subject site and surrounding street system;
(d) Preliminary landscape improvements; and
(e) Preliminary site engineering improvements.
(Ord. 1994-10. Passed 3-22-94.)