(a) Noise that is objectionable as determined by the City due to volume, frequency, or beat shall be muffled, attenuated, or otherwise controlled, subject to the following:
(1) Objectionable sounds of an intermittent nature, or sounds characterized by high frequencies, shall be controlled so as not to become a nuisance to adjacent uses.
(2) Sirens and related apparatus used solely for public purposes are exempt from this requirement. Noise resulting from temporary construction activity shall also be exempt from this requirement.
(3) Noise levels shall not exceed seventy five (75) decibels between the hours of 6:00 a.m. and 10:00 p.m. and shall not exceed sixty (60) decibels between the hours of 10:00 p.m. and 6:00 a.m., and must comply with the levels set forth in the following table:
Sound Levels in Decibels at Property Lines | ||
Octave Band Cycles per Second | Adjacent to All Residential Uses | Adjacent to All Commercial, Office & Industrial Uses
|
Sound Levels in Decibels at Property Lines | ||
Octave Band Cycles per Second | Adjacent to All Residential Uses | Adjacent to All Commercial, Office & Industrial Uses
|
0 to 75 | 58 | 73 |
75 to 150 | 54 | 69 |
150 to 300 | 50 | 65 |
300 to 600 | 46 | 61 |
600 to 1200 | 40 | 55 |
1200 to 2400 | 33 | 43 |
2400 to 4800 | 26 | 41 |
over 4800 | 20 | 35 |
(c) No use shall generate any ground transmitted vibration in excess of the limits set forth below. Vibration shall be measured at the nearest adjacent lot line. The vibration maximums set forth below are stated in terms of particle velocity, which may be measured directly with suitable instrumentation or computed on the basis of displacement and frequency. When computed, the following standards shall apply:
Particle Velocity, Inches-Per Second | |
Frequency in Cycles per Second | Displacement in Inches |
Particle Velocity, Inches-Per Second | |
Frequency in Cycles per Second | Displacement in Inches |
0 to 10 | 0.0010 |
10 to 20 | 0.0008 |
20 to 30 | 0.0005 |
30 to 40 | 0.0004 |
40 and over | 0.0003 |
If requested by the Zoning Administrator, the petitioner shall provide evidence of compliance with the above noted vibration calculations.
(d) Vibrations resulting from temporary construction activity shall be exempt from the requirements of this section.