13.50.140: PUBLIC IMPROVEMENTS:
   A.   The developer of the project shall be responsible for the dedication and improvement of all off site public improvements that do not presently exist according to the width of the ultimate right of way, as called out in the roadway classification map of the Holladay city general plan. If a property has multiple street frontages, improvements are required along all streets. Such improvements shall include, but are not limited to: curb, gutter, sidewalk, streetlights, drive approaches, waterways, road base, asphalt, striping, streetscape, storm drainage, fire hydrants, water mains, laterals, piping of irrigation ditches and flood control systems, fencing of canals, extension of water lines, appurtenances and sewer lines, removal of utility lines out of the right of way (with the exception of traditionally buried lines such as sewer, water, and natural gas transmission lines), etc.
   B.   All required improvements shall be designed and installed by the developer according to the Holladay city standard specifications for public works construction and approved by the city engineer and city public works director. (Ord. 2014-05, 4-17-2014)