Plumbing, electrical and mechanical fees shall not be assessed when such permits are issued in conjunction with a building permit for when required fees have been paid. If two (2) or more subpermits are received, the building permit must be taken out. If only one subpermit is required, and no other work is to be done, fees shall be assessed in accordance with the following fee schedule:
ELECTRICAL, MECHANICAL AND PLUMBING FEES
Minimum fee for any subpermit | $17.00 |
Electrical fees: | |
For each new or modified circuit | 5.00 |
Service change or power to panel (1 meter) | 40.00 |
Each additional meter on the same inspection | 10.00 |
Temporary power (each meter base) | 40.00 |
Mechanical fees: | |
For installation, relocation or modification of each appliance or piece of equipment regulated by the mechanical code, except as noted below | 8.50 |
For each new duct line and outlet | 5.00 |
For each commercial hood | 23.00 |
For each evaporative cooler | 17.00 |
Plumbing fees: | |
For each plumbing fixture or set of fixtures on 1 trap (including supply and drainage piping) | 10.00 |
For each sand or grease trap | 17.00 |
For installation or alteration of supply or drainage piping, water heater or water treatment device | 17.00 |
Note: In cases where this fee schedule cannot practically be applied, the fees shall be determined by the building official.
(Ord. 02-02, 1-3-2002)