Section
General Provisions
50.01 Application for water connection permit
50.02 Meters
50.03 Plumbers
50.04 Permission required
50.05 Installation of curb stops, valves and boxes, and dual check backflow prevention valves
50.06 Standard service pipe installation
50.07 Inspection and testing
50.08 Right-of-way repair
50.09 Application for water service/security deposit
50.10 Rental properties
50.11 Commercial and residential water rates
50.12 Billing and payment
50.13 Disconnection for non-payment
50.14 Notice of discontinuance required
50.15 Meters failing to register
50.16 Interfering with fire hydrants
50.17 Extension of water pipes
50.18 Water limitations
50.19 Authority of Water Department
50.20 Duty and responsibility of occupant or owner
50.21 Malicious or willful damage to water system
50.22 Water users outside of town limits
50.23 Responsibility for breakage of lines
50.24 Rates and charges for services
50.25 Fees; Water Fund
50.26 Construction standards
50.27 Repairs of city water mains and service lines
Water Piping Systems
50.40 Description
50.41 Materials
50.42 Construction requirements
50.43 Final inspection
50.44 Project acceptance and warranty period
50.45 Acceptance by town
50.46 Initial charging and flushing of water mains
50.47 Inspection fees
50.99 Penalty