23-3-7   INTITIAL PERMIT REQUIRED.
   Each manufactured home that locates on a lot in a manufactured home park shall secure an initial Building or Zoning Permit from the Village. All future locations on the same lot shall be exempt from the fee. (See Zoning Code)