§ 53.54 CONSTRUCTION REQUIREMENTS.
   The size, slope, alignment, materials of construction of a building sewer, and the methods to be used in excavating, placing of the pipe, jointing, testing, and backfilling the trench, shall all conform to the requirements of the building and plumbing codes or other applicable rules and regulations of the city or state. In the absence of code provisions or in amplication thereof, the materials and procedures set forth in appropriate specifications of the A.S.T.M. and W.P.C.F. Manual of Practice No. 9 shall apply.
(Ord. 610.14A, passed 1-18-82) Penalty, see § 53.99