Any person, contractor, or company desiring an electrical permit for work to be performed in the city shall, at the time the permit is issued therefor, pay to the City Controller, a fee as required in this section. Any person obtaining a permit following the issuance of a residential stop work order from the Building Commissioner shall pay an additional $250 to the permit fee listed below. Any person obtaining a permit following the issuance of a commercial stop work order from the Building Commissioner shall pay an additional $500 to the permit fee listed below. These fees apply to residential, new work, commercial new work for lighting service or combined light and power service, as well as industrial power, service, or commercial buildings having separate power service, new work or rewiring. These fees include inspections as needed.
Valuation
|
Fee
|
Valuation
|
Fee
|
For a total valuation from $0 to $1,000 | $50 |
For each additional $1,000 or fraction thereof up to and including $15,000 | $15 |
For each additional $1,000 in excess of $15,000 | $10 |
Inspection fee (all projects) | $50 |
Other permit fees
|
Fee |
Early electric service call-in | $50 |
Reconnection of service inspection | $25 |
Electrical examination/Low- voltage examinations | $100 |
Extra inspection/special inspection | $50 |
Red tag inspection | $50 |
HVAC permits for the first 3 tons | $25 |
Electric signs
|
Fee
|
Electric signs
|
Fee
|
Total valuation from $0 to $500 | $50 |
For each additional $500 or fraction thereof | $10 |
Flat fee (new construction and service) | $50 |
Flat fee (remodel or addition) and service | $50 |
Red tag (reinspection) | $50 |
Low-voltage limited license | $200 |
Low voltage permits (first $0 to $500) | $20 |
Each additional $500 or fraction thereof | $10 |
(Prior Code, § 151.36) (Am. Ord. 8888, passed 10-22-2007; Am. Ord. 9201, passed 3-25-2013; Am. Ord. 9446, passed 9-23-2019)