§ 150.110 PERMIT REQUIRED; BARRICADES ERECTED.
   The contractor shall obtain all necessary permits before starting any demolition work. The permit shall be issued for a period of 10 days. All work must be completed in 10 days unless extended by the Building Commissioner. The contractor must check with the Building Commissioner as to the specific type of barricade to be erected. The contractor must also obtain permission from the Board of Public Works and Safety for the city to block or take up any portion of streets, sidewalks or alleys.
(Prior Code, § 150.70) (Ord. 4933, passed 1-28-1985) Penalty, see § 150.999