1193.02 CONSTRUCTION PLANS.
   (a)   Construction plans, including the following, for improvements to be installed shall be furnished to the City in accordance with the specifications of the official having jurisdiction and shall receive approval of those officials before improvements are installed.
   (b)   Drawing Specifications.
      (1)   The centerline profile of each proposed street at the scale of fifty (50) feet or less to the inch, with tentative grades indicated.
      (2)   The typical section of each proposed street, showing the width of pavement, the location and width of sidewalks, and the location and size of utility mains.
      (3)   The plans and profiles of proposed sanitary sewers, with grades and sizes indicated, or method of sewage disposal in lieu of sewers.
      (4)   A plan of the proposed water distribution system, showing pipe sizes and the location of valves and fire hydrants.
      (5)   A plan of the proposed gas distribution system, showing pipe sizes, location of valves and other facilities.
      (6)   A plan of the proposed electric distribution system, showing conduit sizes, and the location of junction boxes, transformers, and streetlights.
      (7)   A detailed storm drainage plan on a separate sheet that provides the following:
         A.   An adequate, complete, and satisfactory detailed drainage plan for the entire area being platted and for all project land uses that is in conformance with the City's stormwater regulations.
         B.   The plan shall include all the information required for the preliminary storm drainage plan and any additional data as may be required by the Director of Engineering. The plan shall detail the design needed to completely drain the area, including design calculations.
         C.   The drainage plan shall clearly show the method to be used for the adequate disposal of all storm water, including drainage outlets and the impact that the proposed development will have on drainage of adjacent areas.
         D.   Construction plans that are sufficiently complete and detailed in order to construct all facilities shown on the drainage plan.
         E.   A certification of the Subdivider and his engineer.
   The detailed storm drainage plan shall be known as the Official Drainage Plan following its approval by the Director of Engineering.
(Ord. 2021-5-30. Passed 5-12-21.)