939.04 WATER TAP FEES AND METER CHARGE FEES.
In addition to the charges imposed by this chapter, the following service fees are hereby established.
(a) The Director of Gas and Water of the City shall prepare and publish annually on the effective date of this section and on January 1 of each year thereafter, a water tap fee schedule which shall set forth the actual cost of labor and materials multiplied by a factor of 1.3. The following fees are current as of the effective date of this section:
WATER TAP FEE
Service Line Diameter (inches) | Water Tap Fee |
3/4 | $1,300 |
1 | $1,350 |
2 | $2,000 |
4 | $3,000 |
6 | $3,500 |
Approved contractor shall make taps greater than 6-inches |
(b) The Director shall prepare and publish annually, on the effective date of this section and on January 1 of each year thereafter, a water meter charge fee schedule which shall set forth the actual cost of labor and materials multiplied by a factor of 1.3. The following fees are current as of the effective date of this section:
WATER METER FEE
Water Meter Size (inches) | Water Meter Fee |
5/8 | $375 |
3/4 | $400 |
1 | $525 |
1-1/2 | $875 |
2 | $1,075 |
3 | $2,900 |
4 | $3,800 |
6 | $5,800 |
8 | $6,800 |
The meter pit and lids costs will be the responsibility of the property owner.
(c) The water tap and meter fee shall be paid in full to the City before a water tap permit is issued. However, arrangements can be made with the Customer Service Department to pay these fees over a one year period which will appear as 12 installments on the monthly utility bill.
(Ord. 2024-2-10. Passed 2-28-24.)