Section
General Provisions
51.01 Creation; purpose
51.02 Definitions
51.03 Scope
51.04 Interpretation
51.05 State statute amendments
51.06 Assessment of benefits
51.07 Tampering with public sewer equipment
Construction Requirements
51.15 Licenses and permits
51.16 Bonds and insurance
51.17 General conditions
51.18 Trench excavations
51.19 Pipe and pipe laying
51.20 Backfill
51.21 Pavement, curb, and sidewalk replacement
51.22 Responsibility for installation
Use of Public Sewer System
51.30 Storm water and unpolluted drainage
51.31 Prohibited discharges
51.32 Pretreatment requirements
51.33 Grease, oil, and sand interceptors
51.34 Control manholes
51.35 Measurements, tests, and analyses
51.36 Heavy metal or toxic discharges
51.37 Accidental discharges
Enforcement
51.45 Right of entry and authority of inspectors
51.46 Noncompliance cause for permit revocation
51.47 Future permits
51.48 Violator liable for expense, loss, or damage
51.49 Written notice of violation
Rates and Charges
51.55 Rates established
51.56 Rates for property located outside town
51.57 No reduced rates or free service
51.58 Determination of charges, generally
51.59 Allowance for metered water not discharged into town's sewer system
51.60 Engineering study
51.61 Separate billing for multi-unit connections
51.62 Deductions for vacancies; removal of apartments from services
51.63 Billing
51.64 Collection procedures
51.65 Adjustment of bill
51.66 Use of sewer after refusal to pay
51.67 Implementation of chapter
51.68 Violations
51.69 Establishment of Sewer Fund
51.70 Annual audit
Water Pollution Control Authority
51.75 Establishment
51.76 Powers
51.77 Organization of sewer staff
51.78 Authority to incur debt
51.79 Flow of funds
51.80 Budgeting
51.81 Executive Committee
51.99 Penalty