§ 51.07 POST-CONSTRUCTION.
   Property owners or operators shall ensure long-term operation and maintenance of post-construction storm water runoff control mechanisms, such as retention basins, dry wells, and other measures described in 40 C.F.R. § 122.34(b)(5)(iii).
(Ord. 2016-02, passed 9-8-2016)