A. The approval or conditional approval of a Vesting Tentative Map shall confer a vested right to proceed with development in substantial compliance with the ordinances, policies, and standards in effect at the time the Vesting Tentative Map is approved or conditionally approved.
B. Notwithstanding subdivision (A) of this section, a permit, approval, extension, or entitlement may be made conditional or denied if any of the following are determined:
1. A failure to do so would place the residents of the subdivision or the immediate community, or both, in a condition dangerous to their health or safety, or both.
2. The condition or denial is required, in order to comply with State or Federal law.
C. The rights referred to herein shall expire if a final map is not approved prior to the expiration of the Vesting Tentative Map as provided in this chapter. If the final map is approved, these rights shall last for the following periods of time:
1. An initial time period of 12 months. Where several final maps are recorded on various phases of a project covered by a single Vesting Tentative Map, this initial time period shall begin for each phase when the final map for the phase is recorded.
2. The initial time period set forth in subdivision 1 of this subsection shall be automatically extended by any time used for processing a complete application for a grading permit or for design or architectural review, if such processing exceeds 30 days, from the date a complete application is filed.
3. A subdivider may apply for a one-year extension at any time before the initial time period set forth in subdivision 1. of this subsection expires. If the extension is denied, the subdivider may appeal that denial to the City Council within fifteen (15) days.
4. If the subdivider submits a complete application for a building permit during the periods of time specified in subdivisions 1. through 3. of this subsection, the rights referred to in this section shall continue until the expiration of that permit, or any extension of that permit.
(Ord. 824- 2016 § 6 (part), 2017)