13.06.130 Hauled Wastewater
   A.   Septic tank waste may be introduced into the POTW only at locations designated by the Director of Public Works, and at such times as are established by the Director of Public Works. Such waste shall not violate Section 13.06.050 of this chapter or any other requirements established by the City of Gridley. The Director of Public Works may require septic tank waste haulers to obtain industrial wastewater discharge permits.
   B.   The Director of Public Works shall require haulers of industrial waste to obtain industrial wastewater discharge permits. The Director of Public Works may require generators of hauled industrial waste to obtain industrial wastewater discharge permits. The Director of Public Works also may prohibit the disposal of hauled industrial waste. The discharge of hauled industrial waste is subject to all other requirements of this chapter.
   C.   Industrial waste haulers may discharge loads only at locations designated by the Director of Public Works. No load may be discharged without prior consent of the Director of Public Works. The Director of Public Works may collect samples of each hauled load to ensure compliance with applicable standards. The Director of Public Works may require the industrial waste hauler to provide a waste analysis of any load prior to discharge.
   D.   Industrial waste haulers must provide a waste-tracking form for every load. This form shall include, at a minimum, the name and address of the industrial waste hauler, permit number, truck identification, names and addresses of sources of. waste, and volume and characteristics of waste. The form shall identify the type of industry, known or suspected waste constituents, and whether any wastes are RCRA hazardous wastes.