Skip to code content (skip section selection)
Compare to:
SEC. 9-6-4 ADMINISTRATION.
   (A)   Designation of Local Floodplain Administrator. The City Engineer or a designee is hereby appointed to administer and implement the provisions of this chapter. For the purposes of this chapter, the City Engineer or designee shall hereafter be referred to as “Local Floodplain Administrator.”
   (B)   Floodplain development permit and certification requirements; plans and application requirements. Application for a floodplain development permit shall be made to the Local Floodplain Administrator on forms furnished by him or her prior to any development activities within flood prone areas. The following items/information shall be presented to the Local Floodplain Administrator to apply for a floodplain development permit:
      (1)   A plot plan drawn to scale which shall include, but shall not be limited to, the following specific details of the proposed floodplain development:
         (a)   The nature, location, dimensions, and elevations of the area of development/disturbance; existing and proposed structures, utility systems, grading/pavement areas, fill materials, storage areas, drainage facilities, and other development;
         (b)   The boundary of the Special Flood Hazard Area as delineated on the FIRM or other flood map as determined in Section 9-6-3(B), or a statement that the entire lot is within the Special Flood Hazard Area;
         (c)   Flood zone(s) designation of the proposed development area as determined on the FIRM or other flood map as determined in Section 9-6-3(B);
         (d)   The boundary of the floodway(s) or non-encroachment area(s) as determined in Section 9-6-3(B);
         (e)   The Base Flood Elevation (BFE) where provided as set forth in Section 9-6-3(B); Section 9-6-4 (E); or Section 9-6-5(D);
         (f)   The old and new location of any watercourse that will be altered or relocated as a result of proposed development; and
         (g)   The certification of the plot plan by a registered land surveyor or professional engineer.
      (2)   Where base flood elevation data is provided in accordance with section 9-6-3(B) or section 9-6-4(E)(11), the application for a floodplain development permit within the Zone A on the Flood Insurance Rate Map shall show:
         (a)   The elevation (in relation to mean sea level) of the lowest floor (including basement) of all new and substantially improved structures;
         (b)   If the structure has been floodproofed in accordance with section 9-6-5(B)(2), the elevation (in relation to NAVD 1988) to which the structure was floodproofed; and
         (c)   Elevation in relation to NAVD 1988 to which any proposed utility systems will be elevated or floodproofed.
      (3)   Where the base flood elevation data is not provided, the application for a development permit must show construction of the lowest floor at least two feet above the highest adjacent grade;
      (4)   Where any watercourse will be altered or relocated as a result of proposed development, the application for a development permit shall include: a description of the extent of watercourse alteration or relocation; an engineering report on the effects of the proposed project on the flood-carrying capacity of the watercourse and the effects to properties located both upstream and downstream; and a map showing the location of the proposed watercourse alteration or relocation;
      (5)   When a structure is floodproofed, the applicant shall provide a floodproofing certificate and back-up plans from a registered professional engineer or architect that the nonresidential floodproofed structure meets the floodproofing criteria in section 9-6-5(B)(2);
      (6)   An elevation certificate (FEMA Form 81-31) or floodproofing certificate (FEMA Form 81-65) is required after the reference level is completed. Within 21 calendar days of establishment of the reference level elevation, or floodproofing, by whatever construction means, whichever is applicable, it shall be the duty of the permit holder to submit to the Local Floodplain Administrator a certification of the elevation of the reference level, or floodproofed elevation, whichever is applicable in relation to NAVD 1988. The certification shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When floodproofing is utilized, the certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. Any work done within the 21-day calendar period and prior to submission of the certification shall be at the permit holder’s risk. The Local Floodplain Administrator shall review the certificate data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being permitted to proceed. Failure to submit the certification or failure to make the corrections required shall be cause to issue a stop-work order for the project;
      (7)   A final as-built elevation certificate (FEMA Form 81-31) or floodproofing certificate (FEMA Form 81-65) is required after construction is completed and prior to certificate of compliance/occupancy issuance. It shall be the duty of the permit holder to submit to the Local Floodplain Administrator a certification of final as-built construction of the elevation or floodproofed elevation of the reference level and all attendant utilities. The certification shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When floodproofing is utilized, the certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. The Local Floodplain Administrator shall review the certificate data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to certificate of compliance/occupancy issuance. In some instances, another certification may be required to certify corrected as-built construction. Failure to submit the certification or failure to make the corrections required shall be cause to withhold the issuance of a certificate of compliance/occupancy;
      (8)   If a manufactured home is placed within an A, AO, AE or A1-30 Zone and the elevation of the chassis is above 36 inches in height, an engineered foundation certification is required per section 9-6-3(B);
      (9)   If a watercourse is to be altered or relocated, a description of the extent of watercourse alteration or relocation; an engineering report on the effects of the proposed project on the flood-carrying capacity of the watercourse and the effects to properties located both upstream and downstream; and a map showing the location of the proposed watercourse alteration or relocation shall all be submitted by the permit applicant prior to issuance of a floodplain development permit;
      (10)   A foundation plan drawn to scale which shall include details of the proposed foundation system to ensure all provisions of this chapter are met. These details include but are not limited to:
         (a)   Proposed method of elevation, if applicable (i.e., fill, solid foundation perimeter wall, solid backfilled foundation, open foundation on columns/piers);
         (b)   Should solid foundation perimeter walls be used in floodplains, details of sufficient openings to facilitate the unimpeded movements of floodwaters in accordance with section 9-6-5(B)(5).
      (11)   Usage details of any enclosed space below the regulatory flood protection elevation;
      (12)   Plans and/or details for the protection of public utilities and facilities such as sewer, gas, electrical and water systems to be located and constructed to minimize flood damage;
      (13)   Copy of all other local, state and federal permits required prior to floodplain development permit issuance (i.e., wetlands, erosion and sedimentation control, riparian buffers, mining and the like); and
      (14)   If floodplain development permit is issued for placement of recreational vehicles and/or temporary structures, documentation to ensure section 9-6-5(B)(4) and (B)(6) of this Code are met.
   (C)   Certification exemptions. The following structures, if located within A, AO, AE or A1-30 Zones, are exempt from the elevation/floodproofing certification requirements specified in subsections (A) and (B) above:
      (1)   Recreational vehicles meeting requirements of section 9-6-5(B)(4);
      (2)   Temporary structures meeting requirements of section 9-6-5(B)(6); and
      (3)   Accessory structures less than 150 square feet meeting requirements of section 9-6-5(B)(7).
   (D)   Determinations for existing buildings and structures. For applications for building permits to improve buildings and structures, including alterations, movement, enlargement, replacement, repair, change of occupancy, additions, rehabilitations, renovations, substantial improvements, repairs of substantial damage, and any other improvement of or work on such buildings and structures, the Floodplain Administrator, in coordination with the Building Official, shall:
      (1)   Estimate the market value, or require the applicant to obtain an appraisal of the market value prepared by a qualified independent appraiser, of the building or structure before the start of construction of the proposed work; in the case of repair, the market value of the building or structure shall be the market value before the damage occurred and before any repairs are made;
      (2)   Compare the cost to perform the improvement, the cost to repair a damaged building to its pre-damaged condition, or the combined costs of improvements and repairs, if applicable, to the market value of the building or structure;
      (3)   Determine and document whether the proposed work constitutes substantial improvement or repair of substantial damage; and
      (4)   Notify the applicant if it is determined that the work constitutes substantial improvement or repair of substantial damage and that compliance with the flood resistant construction requirements of the NC Building Code and this ordinance is required.
   (E)   Floodplain development permit data requirements. The following information shall be provided at a minimum on the floodplain development permit to ensure compliance with this Code:
      (1)   A complete description of the development to be permitted under the floodplain development permit (e.g. house, garage, pool, septic, bulkhead, cabana, pier, bridge, mining, dredging, filling, grading, paving, excavation or drilling operations, or storage of equipment or materials, etc.);
      (2)   The special flood hazard area determination for the proposed development per available data specified in section 9-6-3(B);
      (3)   The regulatory flood protection elevation required for the reference level and all attendant utilities;
      (4)   The regulatory flood protection elevation required for the protection of all public utilities;
      (5)   All certification submittal requirements with timelines;
      (6)   State that no fill material shall encroach into the floodway or non-encroachment area of any watercourse, if applicable unless the requirements of section 9-6-5(C) have been met;
      (7)   If in an A, AO, AE or A1-30 Zone, specify the minimum foundation opening requirements;
      (8)   State limitations of below BFE enclosure uses (if applicable) (i.e., parking, building access and limited storage only); and
      (9)   A statement that all materials below BFE/RFPE must be flood resistant materials.
   (F)   Duties and responsibilities of the Local Floodplain Administrator. Duties of the Local Floodplain Administrator shall include but not be limited to:
      (1)   Review all floodplain development applications and issue permits for all proposed development within flood prone areas to assure that the permit requirements of this chapter have been satisfied;
      (2)   Advise permittee that additional federal or state permits (i.e., wetlands, erosion and sedimentation control, riparian buffers, mining, and the like) may be required, and if specific federal or state permit requirements are known, require that copies of such permits be provided and maintained on file with the floodplain development permit;
      (3)   Notify adjacent communities and the North Carolina Department of Crime Control and Public Safety, Division of Emergency Management, State Coordinator for the National Flood Insurance Program prior to any alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Emergency Management Agency;
      (4)   Assure that maintenance is provided within the altered or relocated portion of the watercourse so that the flood-carrying capacity is not diminished;
      (5)   Prevent encroachments within floodways and non-encroachment areas unless the certification and flood hazard reduction provisions of section 9-6-5 are met;
      (6)   Obtain actual elevation (in relation to mean sea level) of the lowest floor (including basement) of all new or substantially improved structures, and all attendant utilities in accordance with subsection (B)(7) or (8) of this section;
      (7)   Obtain the actual elevation (in relation to mean sea level) to which the new or substantially improved structures and all utilities have been floodproofed, in accordance with subsection (B)(7) or (8) of this section;
      (8)   Obtain actual elevation (in relation to mean sea level) of all public utilities, in accordance with subsection (B) above;
      (9)   When floodproofing is utilized for a particular structure, the Local Floodplain Administrator shall obtain certification from a registered professional engineer or architect, in accordance with this section and section 9-6-5(B)(2);
      (10)   Where interpretation is needed as to the exact location of boundaries of the special flood hazard areas (for example, where there appears to be a conflict between a mapped boundary and actual field conditions), the Local Floodplain Administrator shall make the necessary interpretation. The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this chapter;
      (11)   When base flood elevation data has not been provided in accordance with section 9-6-3(B), then the Local Floodplain Administrator shall obtain, review and reasonably utilize any base flood elevation along with floodway data and/or non-encroachment area data available from a federal, state or other source, including data developed pursuant to section 9-6-5(E)(4) in order to administer the provisions of section 9-6-5;
      (12)   When base flood elevation (BFE) data is provided but no floodway nor non-encroachment area data has been provided in accordance with section 9-6-3(B), obtain, review and reasonably utilize any floodway data, and/or non-encroachment area data available from a federal, state or other source in order to administer the provisions of this chapter;
      (13)   When the exact location of boundaries of the special flood hazard areas conflict with the current, natural topography information at the site, the property owner may apply and be approved for a Letter of Map Amendment (LOMA) by FEMA. A copy of the Letter of Map Amendment issued from FEMA will be maintained by the Local Floodplain Administrator in the permit file;
      (14)   Make on-site inspections of projects in accordance with subsection (F) below. As the work pursuant to a floodplain development permit progresses, the Local Floodplain Administrator shall make as many inspections of the work as may be necessary to ensure that the work is being done according to the provisions of the local ordinance and the terms of the permit. In exercising this power, the Local Floodplain Administrator has a right, upon presentation of proper credentials, to enter on any premises within the jurisdiction of the community at any reasonable hour for the purposes of inspection or other enforcement action;
      (15)   Serve notices of violations, issue stop-work orders, revoke permits and take corrective actions in accordance with subsection (F) below. Whenever a building or part thereof is being constructed, reconstructed, altered or repaired in violation of this chapter, the Local Floodplain Administrator may order the work to be immediately stopped. The stop-work order shall be in writing and directed to the person doing the work. The stop-work order shall state the specific work to be stopped, the specific reason(s) for the stoppage, and the condition(s) under which the work may be resumed. Violation of a stop-work order constitutes a misdemeanor;
      (16)   All records pertaining to the provisions of this chapter shall be permanently maintained in the office of the Local Floodplain Administrator and shall be open for public inspection;
      (17)   Annexation: provide the North Carolina Department of Crime Control and Public Safety, Division of Emergency Management, State Coordinator for the National Flood Insurance Program with two copies of the maps delineating new corporate limits within six months from date of annexation or change in corporate boundaries;
      (18)   Revocation of floodplain development permits as required. The Local Floodplain Administrator may revoke and require the return of the floodplain development permit by notifying the permit holder in writing stating the reason(s) for the revocation. Permits shall be revoked for any substantial departure from the approved application, plans, or specifications; for refusal or failure to comply with the requirements of state or local laws; or for false statements or misrepresentations made in securing the permit. Any floodplain development permit mistakenly issued in violation of an applicable state or local law may also be revoked;
      (19)   Make periodic inspections throughout all special flood hazard areas within the jurisdiction of the community. The Local Floodplain Administrator and each member of his or her inspections department shall have a right, upon presentation of proper credentials, to enter on any premises within the territorial jurisdiction of the department at any reasonable hour for the purposes of inspection or other enforcement action;
      (20)   Follow through with corrective procedures of subsection (F) below;
      (21)   Review, provide input, and make recommendations for variance requests;
      (22)   Maintain a current map repository to include, but not limited to, historical and effective FIS Report, historical and effective FIRM and other official flood maps and studies adopted in accordance with the provisions of Section 9-6-3(B) of this ordinance, including any revisions thereto including Letters of Map Change, issued by FEMA. Notify State and FEMA of mapping needs; and
      (23)   Coordinate revisions to FIS reports and FIRMs, including Letters of Map Revision Based on Fill (LOMR-Fs) and Letters of Map Revision (LOMRs).
   (G)   Administrative corrective procedures.
      (1)   Violations to be corrected. When the Local Floodplain Administrator finds violations of applicable state and local laws, it shall be his or her duty to notify the owner or occupant of the building of the violation. The owner or occupant shall immediately remedy each of the violations of law in the property he or she owns.
      (2)   Actions in event of failure to take corrective action. If the owner of a building or property shall fail to take prompt corrective action, the Local Floodplain Administrator shall give the owner written notice, by certified or registered mail to his or her last known address or by personal service, stating that:
         (a)   The building or property is in violation of the Flood Damage Prevention Ordinance;
         (b)   A hearing will be held before the Local Floodplain Administrator at a designated place and time, not later than ten days after the date of the notice, at which time the owner shall be entitled to be heard in person or by counsel and to present arguments and evidence pertaining to the matter; and
         (c)   Following the hearing, the Local Floodplain Administrator may issue an order to alter, vacate or demolish the building; or to remove fill as appears appropriate.
      (3)   Order to take corrective action. If, upon a hearing held pursuant to the notice prescribed above, the Local Floodplain Administrator finds that the building or development is in violation of the Flood Damage Prevention Ordinance, he or she shall make an order in writing to the owner, requiring the owner to remedy the violation within 60 days. The Local Floodplain Administrator may prescribe a period shorter than 60 days; provided that the Local Floodplain Administrator finds that there is imminent danger to life or other property.
       (4)   Appeal. Any owner who has received an order to take corrective action may appeal from the order to the Board of Adjustment by giving notice of appeal in writing to the Local Floodplain Administrator and the City Clerk within ten days following issuance of the final order. In the absence of an appeal, the order of the Local Floodplain Administrator shall be final. The Board of Adjustment shall hear an appeal within a reasonable time and may affirm, modify and affirm, or revoke the order.
      (5)   Failure to comply with order. If the owner of a building or property fails to comply with an order to take corrective action from which no appeal has been taken, or fails to comply with an order of the Board of Adjustment following an appeal, he or she shall be guilty of a Class 1 misdemeanor pursuant to G.S. 143-215.58 and shall be punished in the discretion of the court.
   (H)   Variances.
      (1)   The Board of Adjustment as established by the city shall hear and decide requests for variances from the requirements of this chapter.
      (2)   Any person aggrieved by the decision of the Board of Adjustment or any taxpayer may appeal the decision to the Superior Court as provided in G.S. Chapter 7A of the North Carolina General Statutes.
      (3)   Variance may be issued for the repair or rehabilitation of historic structures upon the determination that the proposed repair or rehabilitation will not preclude the structure’s continued designation as a historic structure and the variance is the minimum necessary to preserve the historic character and design of the structure.
      (4)   In passing upon such applications for variances, the Board of Adjustment shall consider all technical evaluations, all relevant factors, all standards specified in other sections of this chapter and:
         (a)   The danger that materials may be swept onto other lands to the injury of others;
         (b)   The danger to life and property due to flooding or erosion damage;
         (c)   The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner;
         (d)   The importance of the services provided by the proposed facility to the community;
         (e)   The necessity to the facility of a waterfront location, where applicable;
         (f)   The availability of alternative locations, not subject to flooding or erosion damage, for the proposed use;
         (g)   The compatibility of the proposed use with existing and anticipated development;
         (h)   The relationship of the proposed use to the Comprehensive Plan and floodplain management program for that area;
         (i)   The safety of access to the property in times of flood for ordinary and emergency vehicles;
         (j)   The expected heights, velocity, duration, rate of rise and sediment transport of the floodwaters and the effects of wave action, if applicable, expected at the site; and
         (k)   The costs of providing governmental services during and after flood conditions including maintenance and repair of public utilities and facilities such as sewer, gas, electrical and water systems, and streets and bridges.
      (5)   The findings listed above shall be submitted to the Board of Adjustment, in writing, and included in the application for a variance.
      (6)   Upon consideration of the factors listed above, and the purposes of this chapter, the Board of Adjustment may attach such conditions to the granting of variances as it deems necessary to further the purposes of this chapter.
      (7)   Variances shall not be issued within any designated floodway or non-encroachment area if any increase in flood levels during the base flood discharge would result.
      (8)   Conditions for variances:
         (a)   Variances may not be issued when the variance will make the structure in violation of other federal, state or local laws, regulations or ordinances.
         (b)   Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief.
         (c)   Variances shall only be issued upon:
            1.   A showing of good and sufficient cause;
            2.   A determination that failure to grant the variance would result in exceptional hardship; and
            3.   A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisance, cause fraud on or victimization of the public, or conflict with existing local laws or chapters.
         (d)   Any applicant to whom a variance is granted shall be given written notice specifying the difference between the base flood elevation and the elevation to which the structure is to be built and stating that the cost of flood insurance will be commensurate with the increased risk resulting from the reduced reference level elevation. Such notification shall be maintained with a record of all variance actions.
         (e)   The Local Floodplain Administrator shall maintain the records of all appeal actions and report any variances to the Federal Emergency Management Agency and the State of North Carolina upon request.
      (9)   A variance may be issued for solid waste disposal facilities, hazardous waste management facilities, salvage yards, and chemical storage facilities that are located in special flood hazard areas, provided that all of the following conditions are met. A floodplain development permit may be issued for such development only if a variance is granted:
         (a)   The use serves a critical need in the community;
         (b)   No feasible location exists for the use outside the special flood hazard area;
         (c)   The reference level of any structure is elevated or floodproofed to at least the regulatory flood protection level;
         (d)   The use complies with all other applicable federal, state and local law; and
         (e)   The City of Greenville has notified the Secretary of the North Carolina Department of Crime Control and Public Safety of its intention to grant a variance at least 30 days prior to granting the variance.
(Ord. No. 03-123, passed 12-15-2003; Ord. No. 20-022, passed 5-18-2020)