The following information shall be submitted to the City’s Building Department prior to drilling a new well in groundwater Control Area No. 4:
A. A copy of the well permit obtained from the Central Platte Natural Resources District.
B. The address and legal description of the property on which the proposed well is to be located.
C. The address of all properties to be served by groundwater pumped from the proposed well.
D. A description of the uses to be made of water pumped from the proposed well, if any; including a certification that such groundwater will not be used for domestic use which may result in human exposures.
E. Whether City water is available to the property to be served by the proposed well.
F. The depth of the proposed well and pump intake.
G. A diagram showing the location of the proposed well.
H. An application for any dewatering well will include a plan for the appropriate handling and disposal of the discharge water in accordance with applicable City, State and Federal laws including NPDES permits.
I. A statement as to whether the design capacity of the proposed well exceeds 50 gpm. If the design capacity of the well exceeds 50 gpm, the owner of the well shall demonstrate, by a hydrogeological study performed by a competent environmental consulting firm in accordance with §35-98(B) of this Article, that the operation of the well will not cause the movement of the groundwater contamination or adversely affect the remedial action provided for in the RAP for the Site.
(Added by Ordinance No. 9370, effective 04-03-2012)