The director may require any industrial plant owner to construct, at the owner's expense, monitoring facilities to allow inspection, sampling, and flow measurement of the lateral sewer or internal drainage systems, and may also require sampling or metering equipment to be provided, installed, and operated at the owner's expense.
The monitoring facility shall be situated on the owner's property and located so that it will not be obstructed by landscaping or parked vehicles.
The personnel of the Department shall have access to the monitoring facilities at all times for inspection and sample collection. If the facilities are locked, special arrangements shall be made to allow access. The Department's personnel shall also have the right to set up monitoring devices at the facilities. There shall be ample room in or near such monitoring facilities to allow adequate sampling and composition of samples for analysis. The monitoring facilities, sampling, and measuring equipment shall be maintained at all times in a safe and proper operating condition at the expense of the owner.
The sampling and monitoring facilities shall be provided in accordance with the Department's requirements, standards and specifications. Unless a time extension is otherwise granted by the director, construction shall be completed within ninety days following the issuance of written notification by the Department.