Loading...
The kind and size of materials, slope and alignment of a lateral sewer, and the methods used in excavating, placing of the pipe, jointing, testing, and backfilling the trench, shall all conform to the requirements of the building and plumbing codes or other applicable rules and regulations of the City.
Loading...