CHAPTER 53: WATER AND SEWER SYSTEMS
Section
General Provisions
   53.01   Definitions
   53.02   Laying water and sewer lines, supervision
   53.03   Certain types of paper prohibited in sewer system; evidence of violation
   53.04   Utility easements on city-owned properties
Connections to Water and Sewer Systems
   53.15   Application required before connection with water system
   53.16   Misrepresentations in application; unlawful use of water
   53.17   Conditions for making water and sewer connections
   53.18   Permit provisions
   53.19   Inspection of plans
   53.20   City Engineer to grant permit, cause service lines to be laid; ownership of service lines; revocation of permit, and the like
   53.21   Approval in writing before concealing
   53.22   Reports, record
   53.23   New water service to be metered; obstruction meters; service charges
   53.24   Tap rates
   53.25   Payment of tapping costs
   53.26   System development fees
Rates and Charges
   53.35   Payment of bills; penalties
   53.36   Advance payment of meter deposit
   53.37   Advance payments
   53.38   Waiver of advance payment
   53.39   Transfer service fees
   53.40   Water service charge generally, inside and outside city
   53.41   Charges for sanitary sewer
   53.42   Disconnection for late payment
Cross-reference:
   Local improvements and assessments, see Charter, Art. X
   Engineering Division to survey sewer lines and storm drainage construction, see § 32.032
   Public Utility Division responsible for operating water and sanitary sewer utility service, see § 32.032