Section
General Provisions
53.01 Definitions
53.02 Laying water and sewer lines, supervision
53.03 Certain types of paper prohibited in sewer system; evidence of violation
53.04 Utility easements on city-owned properties
Connections to Water and Sewer Systems
53.15 Application required before connection with water system
53.16 Misrepresentations in application; unlawful use of water
53.17 Conditions for making water and sewer connections
53.18 Permit provisions
53.19 Inspection of plans
53.20 City Engineer to grant permit, cause service lines to be laid; ownership of service lines; revocation of permit, and the like
53.21 Approval in writing before concealing
53.22 Reports, record
53.23 New water service to be metered; obstruction meters; service charges
53.24 Tap rates
53.25 Payment of tapping costs
53.26 System development fees
Rates and Charges
53.35 Payment of bills; penalties
53.36 Advance payment of meter deposit
53.37 Advance payments
53.38 Waiver of advance payment
53.39 Transfer service fees
53.40 Water service charge generally, inside and outside city
53.41 Charges for sanitary sewer
53.42 Disconnection for late payment
Cross-reference:
Local improvements and assessments, see Charter, Art. X
Engineering Division to survey sewer lines and storm drainage construction, see § 32.032
Public Utility Division responsible for operating water and sanitary sewer utility service, see § 32.032