(B) These requirements may include:
(1) Wastewater discharge peak rate and volume over a specified time period;
(2) Chemical analyses of wastewaters;
(3) Information on raw materials, processes, and products affecting wastewater volume and quality;
(4) Quantity and disposition of specific liquid, sludge, oil, solvent, or other materials important to sewer use control;
(5) A plot plan of sewers of the user’s property showing sewer and pretreatment facility location;
(6) Details of wastewater pretreatment facilities; and
(7) Details of systems to prevent and control the losses of materials through spills to the municipal sewers.
(2005 Code, § 53.059) (Ord. G-92-04, passed 6-15-1992)