1315.04 TOPOGRAPHIC SURVEY.
   Each application for preliminary approval of building plans shall be accompanied by a topographic survey, as set forth below, and shall contain all information shown on such form. If the Building Official, after consultation with the Architectural Board of Review, shall determine that further study is desirable with respect to soil conditions, subsurface water conditions, surface drainage, flood plain elevations, construction or other conditions where engineering advice should be obtained, the applicant shall pay to the Village that sum required to cover the fees and expenses of the Village Engineer and any related fees for outside services pertaining thereto. No building permit shall be issued until such topographic survey has first been approved by the Village Engineer. No construction, erection, addition to or moving of any building shall proceed after the footers are in place, until the Building Official has approved the grade. The Building Official may waive the requirement of a topographic survey where the remodeling, alteration or addition will be constructed in conformity with the established grade.
(Ord. 2014-03. Passed 4-8-14.)