The average slope for any hillside development shall be determined by the Planning Commission during the time of preliminary subdivision design. Determination will be on an area- by area basis with each lot sized according to the average topographic change falling within each area.
(Ord. 67-11. Passed 1-24-67.)
(Ord. 67-11. Passed 1-24-67.)