§ 17.2.350 REVIEW CRITERIA.
   Projects subject to design review by the (Type II) or the Planning Commission (Type III) shall be evaluated based on the following:
   A.   The standards of the applicable and any overlay district;
   B.   The general standards of Article 8;
   C.   Departures from code requirements may be permitted as part of a Track 2 Design Review Process, when the following criteria are met.
      1.   The design guidelines contained in the applicable section of the “Design Guideline Handbook” are adequately addressed.
      2.   The demonstrates that the overall would result in a that better meets the intent of the design guidelines than a design that simply meets the Code.
(Ord. 2009-01, passed 3-9-2009; Ord. 2022-01, passed 5-9-2022)