§ 17.2.910 SUBMITTAL REQUIREMENTS.
   The application must be submitted at least ten days before the requested date for beginning the . The following plans and information are required for a review. The may waive specific submittal requirements, if warranted.
   An application for a shall include the following:
   A.   A written description of the proposed , including but not limited to an overview of the project, reason for use, duration, and day(s) and hour(s) of operation.
   B.   A project including the location of the , and parking, all , and project equipment and materials.
   C.   If located within a building, a floor plan showing the location of the .
   D.   The application must include the signature of the property owner, or a letter of authorization from the property owner.
   E.   Additional information as determined by the .
(Ord. 2019-10, passed 9-23-2019)