The application must be submitted at least ten days before the requested date for beginning the
. The following plans and information are required for a
review. The
may waive specific submittal requirements, if warranted.
An application for a
shall include the following:
A. A written description of the proposed
, including but not limited to an overview of the project, reason for use, duration, and day(s) and hour(s) of operation.
B. A project
including the location of the
,
and parking, all
, and project equipment and materials.
C. If located within a building, a floor plan showing the location of the
.
D. The application must include the signature of the property owner, or a letter of authorization from the property owner.
E. Additional information as determined by the
.
(Ord. 2019-10, passed 9-23-2019)