A. The final
shall conform to the tentative
and any conditions of approval.
B. The
shall be prepared in accordance with O.R.S. Chapters 92 and 209 by an Oregon-licensed surveyor and conform to the
standards established by the County Surveyor.
C. An Oregon-licensed land surveyor shall survey and monument the parcels. All monuments on the exterior boundary and all parcel corner monuments of a
shall be placed before the
is offered for recording.
D. The
shall include or be accompanied by:
1. Notarized signature of the owner declaring the ownership and consenting to recording of the
;
2. Legal descriptions of areas proposed for
including
rights-of-way, drainageways,
and
(legal descriptions shall meet the approval of the
);
3. Notarized copy of any
dedicating land to the
signed by the grantor;
4. A description of
,
, utilities and improvements proposed to be made or installed, as well as a time within which such improvements are to be completed;
5. A designated space for approval signatures shall be placed on the
; and
6. All
and adjacent
shall be placed on the
.
(Ord. 2009-01, passed 3-9-2009; Ord. 2013-3, passed 5-22-2013)