(A) Connection fees to the sewer system shall be based upon size, as determined under § 52.055, and the following for those inside the city limits.
(B) Single building connection.
Size | Connection Fee |
Four-inch connection | $625 |
Six-inch connection | $690 |
Over six inches | $1,250 |
(C) Single owner apartments and duplexes on one connection shall be charged only $625 for all single-family dwelling units.
(D) Condominiums and townhouses on one connection shall be charged $625 for the first single- family dwelling unit, plus $625 for each additional unit served by the same connection.
(E) Motels on one connection shall be charged $625, plus $315 per bedroom unit served by the same connection.
(F) Camp areas on one connection shall be charged $625, plus $315 per each space provided therefor.
(G) Business or industrial users on one connection shall be charged a connection fee in accordance with the connection size, plus $625 for each equivalent unit of flow (6,000 gallons/month) to be discharged by the user.
(H) All impact fees, connection fees and/or additional fees or costs imposed by James Island Public Service District (JIPSD), Charleston Public Works (CPW) or any other entity and charged to the city or any future fees imposed by the city, shall be the sole responsibility of the developer or owner of new equivalent units. These fees shall be due and payable prior to the new equivalent units being connected to the water and sewer system. The sewer impact fee per equivalent resident unit (ERU shall be $1,250/ERU.
(`95 Code, § 4-2-65) (Am. Ord. 10-97, passed 7-1-97; Am. Ord. 16-00, passed - - 00; Am. Ord. 22-00, passed 11-28-00; Am. Ord. 05-07, passed 6-26-07; Am. Ord. 12-15, passed 7-14-15)