§ 51.080 INSTALLATION OF SEWER TAPS.
   The installation of sewer taps eight inches or less will be the responsibility of the Water and Wastewater Division. The contractor and/or developer will be responsible for the excavation to and the uncovering of the town sanitary sewer main. All excavation and trenching shall be in accordance with the latest regulation of the occupational safety and health administration. The contractor shall notify the Water and Wastewater Division at least 48 hours in advance for the required sewer taps. Division employees will be prohibited from entering any excavation or trench not meeting the safety requirements of any applicable town, state or federal regulations. Upon completion of the installation of the sewer tap, the contractor and/or developer will be responsible for backfilling the trench and restoring the surface to its original condition or as shown on the approved engineering plans. All sealed connections shall be inspected and approved by the Town Engineer prior to being backfilled in accordance with § 51.078.
(Prior Code, Ch. 18, Art. III, § 18-180) (Ord. 346-04, passed 6-21-2004)