Loading...
Within ten days from the date on which any well is plugged or placed on pump, all pits shall be filled and leveled and the surface of the drilling site restored as nearly as may be to the condition it was in before the commencement of the drilling operation.
(Ord. 363, passed 6-21-65) Penalty, see § 150.99
In the drilling of any well for petroleum or gas the permittee shall set surface pipe to a depth below any and all fresh water sands which might be used in the further by the city, which depth shall be at least 260 feet.
(Ord. 363, passed 6-21-65) Penalty, see § 150.99
Any person, firm or corporation either for himself or his agent, servant, or employee, who has violates any of the provisions of this chapter or who shall be engaged in any work or the erection of any structure which shall be in violation of the provisions of this chapter, upon conviction thereof shall be deemed guilty of a an offense and fined in any sum not exceeding $200 and costs and each day such violation is continued or any structure or equipment is so unlawfully maintained or permitted to exist in violation of this chapter, shall be deemed a separate offense.
(Ord. 363, passed 6-21-65)