§ 154.046 SURVEY REQUIRED.
   (A)   An accurate and complete survey of the land to be subdivided shall be made by a registered civil engineer or licensed land surveyor. All monuments, property lines, adjoining surveys, centerlines of streets, alleys and easements adjoining or within the subdivision shall be tied into the survey. The allowable error of closure on any portion of the final map shall not exceed 1/10,000 for field closures and 1/20,000 for calculated closures.
   (B)   At the time of making the survey for the final map, the engineer or surveyor shall set sufficient durable monuments to conform with the standards described in Cal. Bus. and Prof. Code § 8771 so that another engineer or surveyor may readily retrace the survey. The exterior boundary line of each lot shall be monumented. Other monuments shall be set as required by the City Engineer.
('63 Code, § 10-4.403.2) (Ord. 416-C.S., passed 12-6-84; Am. Ord. 710-C.S., passed 3-20-07)