1046.16   INSTALLATION REQUIREMENTS.
   (a)   Primary Service. Architects, engineers, electrical contractors and/or customers are requested to consult the Borough before completing plans which include the installation of primary voltage equipment or facilities. Due to the special nature of each installation, it is necessary that specific information be secured from the Borough regarding service entrance and meter requirements. (Primary voltage is any voltage in excess of secondary service voltages.)
   (b)   Changes in Service Entrance Connections. Should any change in the service entrance location, including underground service, become necessary due to the erection, remodeling or change in any building, either on the property of the customer or on adjoining property, or due to any Municipal official or any other cause beyond the Borough's control, the entire cost of such change shall be borne by the customer or other person responsible for causing such change.
   (c)   Secondary Service.
      (1)   The Borough hereby establishes the following as its nominal secondary voltage for supply to customers:
Phase
Wires
Voltage
Phase
Wires
Voltage
1
2
120
1
3
120/208
1
3
120/240
3
4
120/208
3
4
120/240
3
3
480
3
4
277/480
 
      (2)   The Borough reserves the right to specify the minimum size of load which will be supplied at any of the secondary voltages in excess of 240 volts. In all cases where the customer plans to utilize secondary voltage in excess of 240 volts, the Borough shall first be consulted as to the availability of such voltage.
      (3)   At various points throughout the Borough's electric distribution system the service voltage for a particular area may be established at either a higher or a lower voltage. This information may be obtained from the Borough Electric Department upon request.
(Ord. 2211. Passed 4-29-97.)