7-2-1: WATER AND SEWER TAPS:
No connection to a water or sewer main shall be made without a permit being issued and twenty four (24) hours' notice having been given to the Director of Engineering and Community Development. All such connections shall be made under the supervision of the Director of Engineering and Community Development, and no connection shall be covered until the work has been inspected by him or his authorized representative, together with a tender of the proper tap-on and inspection fee in an amount determined by resolution of the Mayor and Board of Trustees and in accordance with the provisions of Section 8-12B-1-2 and 8-12B-4 of this Code, prior to the issuance of any permit.
Inspection by closed circuit television shall be required prior to approval and acceptance by the Village of all sanitary and storm sewers. All costs for said inspection shall be paid by the developer. The Director of Engineering and Community Development shall evaluate the reports and photographs obtained thereby. If said photographs and evidence show the sewer main to be free from engineering defect and foreign substance and show that it meets all other approved engineering standards, the Director of Engineering and Community Development shall approve the mains for acceptance by the Village; if not, he shall direct such remedial activity as is necessary to be done prior to the acceptance of said mains. All photographs and reports obtained as a result of said inspection shall be the property of the Village.
(Ord. 856, 6-5-1973; amd. Ord. 1456, 5-12-1981; 1992 Code)