12-4-7: BRIDGES, CULVERTS AND LOW WATER CROSSINGS:
   A.   Construction At Expense Of Developer: Bridges and low water crossings of primary benefit to the developer, as determined by the planning commission, shall be constructed at the full expense of the developer without reimbursement from municipal or county government. The sharing of expense, as determined by the planning commission, will be fixed by special agreement between municipal or county government and the developer.
   B.   Construction; Size: Bridges, culverts, or low water crossings shall be provided where watercourses cross continuous streets or alleys, and shall be sized and constructed to accommodate the 100-year frequency rain, based on the drainage area involved.
   C.   Design: Design of bridges, low water crossings and culverts shall conform to municipal or county construction specifications. (Ord. 1-10-85, 1-10-1985, eff. 2-10-1985)