1224.11   PRELIMINARY PLAT REQUIRED.
   After the preapplication stage, the subdivider shall submit a preliminary plat of the proposed subdivision which shall conform to the requirements set forth in Sections 1224.12 to 1224.17, inclusive, of this chapter. The preliminary plat shall be prepared by a qualified, registered engineer or surveyor.
(Ord. 12-02. Passed 7-8-02.)