(a) A site plan shall be prepared and stamped by a design professional registered in the State of Ohio. The site plan shall:
(1) Shall be drawn to a minimum scale of ¼" per 1'-0" and all site plan surveys shall be drawn at a minimum of 1" equals 20';
(2) Show property address, lines and physical dimensions of the property;
(3) Show location, dimensions and types of existing structures on the property;
(4) Show the location of the proposed solar energy system;
(5) Show the right of way of any public road that is contiguous to the property;
(6) Show any overhead utility lines including any special easements for the lines;
(7) Show any underground utilities present within proximity of the solar energy system or its foundations;
(8) Show all specified set back distances;
(9) Show all property owners, areas and structures within 200 feet of the proposed system;
(10) Indicate solar energy system manufacturer, contact information, make, model number, and min and max KW or KVA ratings for photovoltaic units.
(b) The site plan shall be reviewed by the City Engineer for technical analysis and the Zoning Inspector shall review for zoning issues. The Chief Building Official shall review and approve the construction documents.
(Ord. 2010-061. Passed 6-22-10.)