A fee shall be charged for each permit for plumbing installation, the amount of such fee to be determined according to the following schedule:
(a) Residential plumbing, one, two and three family dwellings:
All new buildings or structures or additions for each contractor:
Base fee for all new one, two and three family, each dwelling: $50.00.
(1) Also, per 100 sq. ft. of floor area, including garage, basement and all floors: $2.50.
(2) Add required State of Ohio fee, commercial 3%, residential 1%.
(Ord. 2006-039. Passed 5-9-06.)
(b) All other residential, one, two and three family dwellings, alteration(s) or replacement(s) to existing plumbing system:
Base fee: $50.00. (Ord. 2015-087. Passed 11-24-15.)
(1) Each hot water tank: $5.00.
(2) Lawn sprinkler system, per head: $1.00.
(3) Installation of water, gas, pneumatic or hydraulic lines per 100 feet: $2.00.
(4) Each item not listed: $1.00.
(5) Add required State of Ohio fee, residential 1%.
(c) Additional penalty fees; the following penalty fees shall be imposed at the discretion of the Building Administrator or Building Official:
(1) Where work is begun without first obtaining a permit and paying the fee as indicated above, the applicant for a permit shall be charged a fee of up to triple the amount of the fee indicated in this section.
(2) Reinspection of same item: $50.00.
(3) Inspection called and appearance of inspector on property and work not ready or not completed: $50.00.
(4) Work covered without inspection: $100.00.
(5) Where a contractor is not registered with the City: $100.00.
(Ord. 2006-039. Passed 5-9-06.)