913.16 INSTALLATION OF WATER QUALITY STORMWATER CONTROL MEASURES.
   The applicant may not direct runoff through any water quality structures until the site has reached final stabilization as determined by the City of Eastlake. This occurs after the completion of the final grade at the site, after all of the utilities are installed, and the site is subsequently stabilized with vegetation or other appropriate methods. The developer must provide documentation acceptable to the City of Eastlake to demonstrate that the site is completely stabilized. Upon this proof of compliance, the water quality structure(s) may be completed and placed into service. Upon completion of installation of these practices, all disturbed areas and/or exposed soils caused by the installation of these practices must be stabilized with in 2 days.
(Ord. 2017-093. Passed 11-28-17.)