(A) It is strongly recommended that the applicant and the project engineer meet with city staff prior to generating detailed design calculations and construction drawings in order to review and plan design requirements for a particular project. This application is not a separate submittal from the stormwater management plan requirements outlined in § 53.110.
(B) It is the responsibility of the applicant to include in the stormwater management plan application sufficient information for the city to evaluate:
(1) The environmental and hydraulic characteristics of the affected areas;
(2) The potential and predicted impacts of the proposed activity on community waters; and
(3) The effectiveness and acceptability of those measures proposed by the applicant for eliminating or reducing adverse impacts.
(C) The stormwater management plan application shall contain:
(1) The name, address, and telephone number of the owner and applicant, and the entity that will maintain the system;
(2) The maps, charts, graphs, tables, photographs, narrative descriptions, explanations, and citations to support references, as appropriate to communicate the information required by this chapter; and
(3) Construction plans and specifications for all components of the stormwater management system shall be included in the stormwater management plan application, which shall be prepared or directly supervised by, signed, and sealed by a professional engineer.
(Ord. 48-05, passed 9-6-05)