9-1-5: MANUFACTURED HOME INSTALLATION PERMITS:
Placement of manufactured homes shall require an installation permit. No manufactured home shall be placed that has not been constructed to withstand a minimum fifty five (55) pound per square foot (psf) roof live load, or the owner has provided for a separate roof cover that is constructed to provide the required roof live load. The permit applicant shall supply to the building official the same site information required from an applicant seeking a building permit for a single-family dwelling and pay a permit fee. (Ord. 130, 4-24-2014)