§ 52.093  DISCHARGE REQUIREMENTS.
   (A)   Generally.  In addition to the foregoing, the following requirements shall apply.
   (B)   Specifically.
      (1)   No slug loads, as defined by § 52.002, shall be permitted.
      (2)   New sources shall install, have in operation, and start up all pollution control equipment necessary to meet applicable pretreatment standards before beginning discharge.  Within the shortest feasible time, not to exceed 90 days, new sources must be in compliance with all pretreatment standards.
      (3)   All categorical and noncategorical users of the sewer system shall immediately notify the wastewater plant of all discharges that could cause problems with plant operations, including any slug loads.  A written report is required within five days detailing conditions which caused the slug load to be discharged and steps taken to eliminate reoccurrence of the slug loading.  Immediate notice shall be provided to the authority at 857-2709 with a follow-up report sent to the authority at P.O. Box 789, Saugatuck, MI, 49453.
      (4)   No trucked or hauled pollutants may be discharged to the POTW, except at points designated by the POTW.
(1995 Code, § 58-344)  (Ord. passed 5-22-1995)  Penalty, see § 52.999