(a) General.
(1) The construction plan will be combined with the post-construction plan and riparian/wetland setback plan that have also been developed for the site.
(2) Storm water management plan review is subject to review and approval by the City Engineer as established in Section 1165.12 Storm Water Management Plans.
(b) Other Permits Required.
(1) Plans developed by the site owners and approved by the City in accordance with this regulation do not relieve the site owner of responsibility for obtaining and complying with all other necessary permits and/or approvals from federal, state, county, and local agencies and departments.
A. If requirements vary, the most stringent requirement shall be followed.
B. Plans submitted to the City Engineer for review and approval, shall be accompanied by all other required permits and documentation relevant to the project, including but not limited to the permits required and issued by the U.S. Army Corps of Engineers, the Ohio EPA and ODNR Division of Water.
(2) No soil disturbing activity shall begin before all necessary local, county, state, and federal permits have been granted to the owner or operator.
(c) Inspection Required. The City will perform construction inspections until the site reaches final stabilization as determined by the City Engineer.
(Ord. 7675. Passed 11-11-14.)