(a) Plans shall be required for all new plumbing installations involving two (2) or more fixtures.
(b) Plans shall show the plumbing system completely, including drains, soil, waste, vent, revent pipes, traps and all water supply pipes within the building.
(c) A rough sketch shall be provided for all remodeling work.
(d) The plumbing inspector shall be notified if plans are to be changed and such change shall be approved before work is installed. (Ord. 0-13-51, 11-4-2013)