§ 22-201.   Definitions.
   1.   For the purposes of this Chapter; the following words and phrases shall have the meaning as given in this Part.
   2.   Words in the present tense include the future.
   3.   The singular includes the plural.
   4.   The word “shall” is mandatory, the word “may” is optional.
   5.   The word “person” means an individual, corporation, partnership, firm, association, company, or any other similar entity.
   6.   Specific Definitions.
   Alley–a minor right-of-way privately or publicly owned, primarily for service access to the back or side of properties.
   Applicant–a landowner or developer, as hereinafter defined, who has filed an application for development, including his heirs, successors, and assigns.
   Application for development–every application whether preliminary or final, required to be filed and approved prior to start of construction or development including, but not limited to, an application for a building permit for the approval of a development plan.
   Block–an area bounded by streets.
   Building setback line–a line parallel to and set back from the front lot line a distance equal to the depth of the required front yard.
   Cartway–the surface of a street or road available for vehicular traffic.
   Clear sight triangle–an area of unobstructed vision at street intersections defined, by lines of sight between points at a given distance from the intersection of the street center lines.
   Crosswalk–a publicly or privately owned right-of-way for pedestrian use extending from a street into a block or across a block to another street.
   Developer–any landowner, agent of such landowner or tenant who, with the permission of such landowner, makes or causes to be made a subdivision of land or a land development or resubdivision.
   Dwelling–a building or a portion thereof designed for and used exclusively for residential occupancy.
   (1)   Dwelling unit–one or more rooms having cooking, and sanitary facilities and access directly outdoors through a common entrance hall.
   (2)   Dwelling, single-family detached–a building containing only one dwelling unit and two side yards.
   (3)   Dwelling, single-family semi-detached–a building containing two dwelling units which are separated by one common wall, and which has two side yards.
   (4)   Dwelling, single-family attached–a building containing three or more dwelling units which are separated from each other by two common walls, except for the two end units.
   (5)   Dwelling, two-family detached–a building containing two dwelling units arranged one over the other on separate floors, and which has two side yards.
   (6)   Dwelling, multi-family–a building other than, a single-family attached dwelling containing three or more dwelling units.
   Easement, utility–a right-of-way granted for the limited use of land for public or quasi-public purposes.
   Engineer–a registered professional engineer in Pennsylvania designated by the Borough to perform the duties of engineer as herein specified.
   Engineering specifications–the engineering specifications of the Borough regulating the installation of any required improvement or for any facility installed by any owner, subject to public use.
   Erosion–the removal of surface materials by the action of natural elements.
   Excavation–any act by which earth, sand, gravel, rock or any other similar material is dug into, cut, quarried, uncovered, removed, displaced, relocated or bulldozed. It shall include the conditions resulting therefrom.
   Fill–(1) any act which earth, sand, gravel, rock or any other material is placed, pushed, dumped, pulled, transported or moved to a new location above the natural surface of the ground or on top of the stripped surface. It shall include the conditions resulting therefrom; (2) the difference in elevation between a point on the original ground and a designated point of higher elevation of the final grade; (3) the material used to make fill.
   Flood
   (1)   Floodprone area–a relatively flat or low land area adjoining a stream, river or watercourse, which is subject to partial or complete inundation; or, any area subject to the unusual and rapid accumulation or runoff of surface waters from any source.
   (2)   Floodway–the channel of a river or other watercourse and the adjacent land areas required to carry and discharge a flood of a given magnitude.
   (3)   Regulatory flood–a flood having an average frequency of occurrence on the order of once in 100 years, although the flood may occur in any year.
   (4)   Regulatory flood elevation–the 100-year flood elevation based upon the information contained in the Official Flood Insurance Study, as prepared by the Federal Insurance Administration.
   Governing body–the Borough Council of Dauphin Borough.
   Improvements–those physical additions and changes to the land that may be necessary to produce usable and desirable lots.
   Land development
   (1)   The improvement of one lot or two or more contiguous lots, tracts or parcels of land for any purpose involving:
   (a)   A group of two or more buildings.
   (b)   The division or allocation of land or space between or among two or more existing or prospective occupants by means of, or for the purpose of, streets, common areas, leaseholds, condominiums, building groups or other structures.
   (2)   A subdivision of land.
   Landowner–the legal or beneficial owner or owners of land including the holder of an option or contract, to purchase (whether or not such option or contract is subject to any conditions), a lessee if he is, authorized under the lease to exercise the rights of the landowner, or other person having a proprietary interest in land, shall be deemed to be a landowner for the purpose of this Chapter.
   Lot–a plat or parcel of land which is, or in the future may be, offered for sale, conveyance, transfer, or improvement.
   Lot, through or double frontage–a lot with front and rear street frontage.
   Lot, area–the area contained within the property lines of lot as shown on a subdivision plan excluding space within any street right-of-way, but including the area of any easement.
   Lot, reverse frontage–a lot extending between, and having frontage on, an arterial street and a minor street, and with vehicular access solely from the latter.
   Mobile home–a transportable, single-family dwelling intended for permanent occupancy, office or place of assembly contained in one unit, or in two units designed to be joined into one integral unit capable of again being separated for repeated towing, which arrives at a site complete and ready for occupancy except for minor and incidental unpacking and assembly operations, and constructed so that it may be used without permanent foundation.
   Mobile home lot–a parcel of land in a mobile home park, improved with the necessary utility connections and other appurtenances necessary for the erections thereon of a single mobile home, which is leased by the park owner to the occupants of the mobile home erected on the lot.
   Mobile home park–a parcel of land under single ownership which has been planned and improved for the placement of mobile homes for nontransient use, consisting of two or more mobile home lots.
   Plan, sketch–an informal plan, not necessarily to exact scale, indicating existing features of a tract, its surroundings, and the general layout of a proposed subdivision or land development.
   Plan, preliminary–a tentative subdivision or land development plan, in lesser detail than the final plan, indicating the approximate proposed layouts of a subdivision as a basis for consideration prior to preparation of the final plan.
   Plan, final–a complete and exact subdivision or land development plan prepared for official recording as required by statute.
   Public grounds–parks, playgrounds and other public areas and sites for schools, sewage treatment, refuse disposal and other publicly owned or operated facilities.
   Public notice–notice published once each week for 2 successive weeks in a newspaper of general circulation in the Borough. Such notice shall state the time, place, and date of the hearing and the particular nature of the matter to be considered at the hearing. The first publication shall be not more than 30 days nor less than 7 days from the date of the hearing. [Ord. 2012-03]
   Resubdivision-any replatting or resubdivision of land limited to change in lot lines on an approved final plan or recorded plan.
   Right-of-way, street–a public thoroughfare for vehicular traffic and/or pedestrian traffic, whether designated as a street, highway, thoroughfare, parkway, road, avenue, boulevard, lane, alley, or however designated.
   Runoff–the surface water discharge or rate of discharge of a given watershed after a fall of rain or snow that does not enter the soil but runs off of the surface of the land.
   Sedimentation–the process by which mineral or organic matter is accumulated or deposited by moving wind, water or gravity. Once this matter is deposited (or remains suspended in water), it is usually referred to as “sediment.”
   Sight distance–the length of roadway visible to the driver of a passenger vehicle at any given point on the roadway when the view is unobstructed by traffic.
   Slope–the face of an embankment or cut section; any ground whose surface makes an angle with the plane of the horizon. Slopes are usually expressed in a percentage based upon vertical difference in feet per 100 feet of horizontal distance.
   Street–a right-of-way or portion thereof dedicated or intended for general public, vehicular, and/or pedestrian use.
   Streets
   (1)   Arterial street–a major street or highway with fast or heavy traffic volumes of considerable continuity, and used primarily as a traffic artery for intercommunications among large areas.
   (2)   Collector street–a major street or highway which carries traffic from minor streets to arterial streets including the principal entrance streets of a residential development and streets for circulation within such a development.
   (3)   Minor street–a street used primarily for access to abutting properties.
   (4)   Cul-de-sac–a street intersecting another street at one end and terminating at the other in a vehicular turnaround.
   (5)   Marginal access street–a minor street which is parallel and adjacent to limited access highways or arterial streets and which provides access to abutting properties and protection from traffic.
   Structure–anything constructed or erected with a fixed location on the ground, or attached to something having a fixed location on the ground including, but not limited to, buildings, factories, sheds, cabins, mobile homes and other similar items.
   Subdivider–the owner or authorized agent of the owner of a lot, tract or parcel of land to be subdivided for sale or development under the terms of this Chapter.
   Subdivision (see “land development”)–the division or redivision of a lot, tract or parcel of land by any means into two or more lots, tracts, parcels or other divisions of land including changes in existing lot lines for the purpose, whether immediate or future, of lease, transfer of ownership, or of building or lot develop ment; provided, however, that the division of land for agricultural purposes into parcels of more than 10 acres, not involving any new street or easement of access, shall be exempted.
   Surface drainage plan–a plan showing all present and proposed grades and facilities for stormwater drainage.
   Top soil–surface soils and subsurface soils which presumably are fertile soils and soil material ordinarily rich in organic matter or humus debris. Top soil usually found in the uppermost, soil layer called the “A” Horizon.
   Undeveloped land–any lot, tract or parcel of land which has not been graded or in any other manner improved or prepared for subdivision or land development or the construction of a building.
   Watercourse–a natural stream of water, river; brook, creek, or a channel of a perceptible extent, with definite bed and banks to confine and conduct continuously or periodically flowing water.
(Ord. 6/6/1977, Art. II; as amended by Ord. 2012-03, 12/4/2012)