§ 18-105.   Connection by Borough.
   If any owner required by this Part to connect his property with the sewer system has failed to do so within 60 days after written notice of this Part has been given by the Borough, the Borough may cause such connection to be made and collect the cost thereof by a connection fee from such owner by an action in assumpsit.
(Ord. 91-4, 10/8/1991, §1.05)