4-1-14-3: PERMIT FEES:
   (A)   Plan Review Fees: Plan review fees are accessed through outside professional services.
Single-family residence
$315.00
Residential additions
215.00
Detached garage
115.00
Multi-family residence
$315.00 per dwelling unit
Basement remodeling, deck, shed, etc.
$115.00
Commercial, office, industrial
$0.003 x construction cost as determined by the most current publication of the "Means Cost Estimating Guide"
Elevators, escalators, dumbwaiters, platform lifts
$100.00
Parking lots
100.00
Sign permits
50.00
Resubmittals
$65.00 for each
 
The City reserves the right to employ outside review of any and all plans submitted and the cost of such review will be paid by the applicant.
   (B)   Construction Permit Fees:
      1.   Computing Fees: For the purposes of computing fees, all subordinate detached buildings, the use of which is clearly related to that of the main building located on the same plot, shall be considered to constitute a part of the main building when included in the same application for a building permit or when a permit is obtained for the detached subordinate building or buildings before occupancy of the main building.
      2.   Building Permit: The building permit fee for all new construction, additions, and alterations shall be based on the estimated cost of construction including all structural, electrical, plumbing, mechanical interior finish and site preparation elements. The following table sets forth said fees:
Construction Cost
Fee
Construction Cost
Fee
$0.00 - $8,000.00
$ 75.00
$8,001.00 - $15,000.00
150.00
$15,001.00 - $20,000.00
200.00
$20,001.00 - $25,000.00
250.00
$25,001.00 - $35,000.00
500.00
$35,001.00 - $50,000.00
750.00
$50,001.00 - $75,000.00
1,000.00
$75,001.00 - $100,000.00
1,250.00
$100,001.00 - $150,000.00
1,500.00
$150,001.00 - $200,000.00
2,000.00
Over $200,000.00
2,500.00+ $10.00/$1,000.00
 
      3.   Plumbing Permits 1 : A separate plumbing permit shall be required when plumbing work is not performed in connection with a required building permit for new construction, alterations, additions, repairs or accessory uses. The plumbing permit fee shall be based on the following schedule:
 
Residential
$50.00
Nonresidential
50.00
 
      4.   Electrical Permits: An electrical permit shall be required when electrical work is not performed in connection with a required building permit for new construction, alterations, additions, repairs or accessory uses. The electrical permit fee shall be based on the following schedule:
 
Residential
$50.00
Nonresidential
50.00
 
      5.   Elevator Permits:
 
Dumbwaiter
30.00
Elevator
50.00
Escalator
50.00
Hinged platform lift
50.00
Movable stage or orchestra floor
50.00
Platform lift
50.00
 
All existing elevators shall be inspected annually, at the cost of the property owner.
      6.   Permits For Tanks For Flammable Liquids:
 
Class 1 and 2 (1,000 gallon capacity)
$50.00
Each 100 gallons or fraction thereof over 1,000
Add $2.00
Class 3 and 4 (550 gallons or less)
$40.00
Each additional 1,000 gallons or fraction thereof over 550
Add $2.00
 
      7.   Other Permits Which May Require Plan Review Fee:
Building demolition:
500 square feet or less
$ 50.00
Over 500 square feet
100.00
Commercial air conditioner
150.00
Deck
50.00
Detached garage:
Up to 800 square feet
100.00
Driveways/parking lots:
Residential
$50.00 for private portion of driveway; $75.00 for private and work within street right-of-way
Nonresidential
$100.00
Fence
25.00
Fire protection systems, including, but not limited to, range hoods, sprinklers, alarms
50.00
Heating system/furnace
50.00
Incinerator (State approved):
5 square feet or less
50.00
Each additional 5 square feet
5.00
Residential air conditioner
50.00
Satellite dish
50.00
Shed:
100 to 800 square feet
50.00
Steam boiler
75.00
Swimming pool:
Aboveground
50.00
Inground
100.00
Tank removal
100.00
Other permits
50.00
 
      8.   Sign Permits 1 : The erection, construction or alteration of any sign, or its advertising structure, marquee, canopy or awning, requires a sign permit based on the following schedule:
 
Illuminated signs plus $2.00 per square foot of gross surface area of each face thereof
$200.00
Marquees, canopies and awnings plus $0.20 per square foot of gross surface area
20.00
Nonilluminated signs (unless temporary) plus $1.00 per square foot of gross surface area of each face thereof
100.00
Permanent residential development sign as described in subsection 4-3-10(A)3 of this title
No charge
Reface of existing sign
$100.00
Temporary signs
35.00
 
      9.   Other Fees:
Elevator inspection
50.00
Final occupancy
50.00
Reinspection:
First occurrence
80.00
Second occurrence
100.00
Violation of Building Code:
First offense
100.00
Subsequent offense
200.00
Work started without permit
2 times standard fee
 
   (C)   Independent Inspectors: The City may, from time to time, hire an independent inspector to make inspections which cannot be performed by the staff building inspectors. The cost of said inspections shall be paid by the builder.
   (D)   Reinspections: Whenever a reinspection is required, due to inaccurate information or construction, an additional fee of eighty dollars ($80.00) shall be charged for the first reinspection. A one hundred dollar ($100.00) fee shall be charged for each additional reinspection after the first reinspection. This fee shall be payable prior to the reinspection being performed.
   (E)   Failure To Receive Required Inspection: If a builder fails to receive a required inspection and continues to work, there shall be a one hundred dollar ($100.00) fee. A building inspector may require removal of any unauthorized work in order to adequately make a required inspection.
   (F)   Work Started Without A Permit: Whenever work for which a permit is required is commenced without a permit, the applicant shall pay the following additional fees:
Fifty dollars ($50.00) for the first three thousand dollars ($3,000.00) of construction cost, and twenty dollars ($20.00) per one thousand dollars ($1,000.00) of additional cost of construction in order to reimburse the City for clerical, inspection and other administrative expenses.
   (G)   Permit Pick Up: Building permits must be picked up within sixty (60) days of approval. If a permit is not picked up within sixty (60) days, it will become null and void and the applicant will be charged the applicable plan review fee.
   (H)   Temporary Certificate Of Occupancy (Valid For A Period Not To Exceed 120 Days):
 
Residential
$100.00 plus cash bond for cost of outstanding work
Commercial
$150.00 plus cash bond for cost of outstanding work
 
   In addition, the seller/owner of any property for which a temporary certificate of occupancy is sought shall post the following sums to ensure the completion of incomplete items as follows:
 
Asphalt driveway approach/private driveway
$10.00 per square foot
Concrete driveway approach/private driveway
$15.00 per square foot
Private landscaping
$4,000.00
Public landscaping, infrastructure, storm sewer, storm sewer structure and water valves
3,000.00
Sidewalk
$15.00 per square foot
Site grading
$5,000.00
 
Such sums shall be released upon the issuance of a final certificate of occupancy. In the event all or a portion of said work is not completed by the expiration of the prescribed period of not to exceed one hundred twenty (120) days, the City may, in its discretion, release such funds to the property owner or cause uncompleted work to be completed.
   (I)    Final Certificate Of Occupancy:   $50.00
(Ord. 0-43-12, 12-17-2012; amd. Ord. 0-15-18, 8-6-2018)

 