(a) Upon request by a railroad company for verification of its track, the department shall prepare an on-site survey of the railroad company’s operational track within the city. The survey may be based upon:
(1) engineering data previously furnished to the director by the railroad company as described in Section 39-5(a); and
(2) the department’s independent investigation of any crossing conditions and operations relevant to a speed limit determination.
(b) Based upon the department’s survey, the director shall verify the railroad company’s operational track within the city by confirming the track to be:
(1) FRA class 1 track;
(2) FRA class 2 track;
(3) FRA class 3 track;
(4) FRA class 4 track;
(5) FRA class 5 track;
(6) FRA class 6 track; or
(7) special class track.
(Ord. 18100)