1339.05 REGULATIONS FOR SAND BLASTING, POWER ASSISTED PROPELLING OF SOLIDS OR LIQUIDS, OR ANY SIMILAR METHODS.
   All operations for the removal of paint, stain or similar coatings from the exterior surface of a structure by sand blasting, power assisted propelling of solids or liquids, or any similar methods, shall be performed in accordance with the following regulations:
   (a)    No such operation shall take place outside the hours of 8:00 a.m. and 6:00 p.m.
   (b)    The permittee shall provide written notification to each abutting and adjoining property no less than twenty-four (24) hours prior to when the work is to commence. The written notice shall state the nature of the work being performed, the address where the work is being performed, and the date when the work will commence.
   (c)    All such operations shall be shielded by tarpaulins or other suitable screening no as to prevent vapor, dust and debris from causing a nuisance by falling on pedestrians, vehicles, public thoroughfares and adjoining property.
   (d)    All vents, windows and other areas through which air might enter the premises upon which the work is being conducted, shall be covered to prevent infiltration.
   (e)    After the completion of the work to be performed under the permit, the person, firm or corporation shall be required to thoroughly clean up all residue from the permit premises and adjacent property, public rights-of-way or thoroughfares. In addition, the person, firm or corporation shall ensure that no such work is performed in such a manner so as to cause or create a public nuisance and shall further ensure that the clean up of the work area is in such a manner as not to cause or create a public nuisance.
      (Ord. 37-1994. Passed 3-14-94.)