Skip to code content (skip section selection)
Compare to:
Cumming Overview
Cumming, IA Code of Ordinances
CODE OF ORDINANCES OF THE CITY OF CUMMING, IOWA
SUPPLEMENT RECORD
CHAPTER 1 CODE OF ORDINANCES
CHAPTER 2 CHARTER
CHAPTER 3 MUNICIPAL INFRACTIONS
CHAPTER 5 OPERATING PROCEDURES
CHAPTER 6 CITY ELECTIONS
CHAPTER 7 FISCAL MANAGEMENT
CHAPTER 8 INDUSTRIAL PROPERTY TAX EXEMPTIONS
CHAPTER 9 URBAN REVITALIZATION
CHAPTER 10 URBAN RENEWAL
CHAPTER 15 MAYOR
CHAPTER 16 MAYOR PRO TEM
CHAPTER 17 CITY COUNCIL
CHAPTER 18 CITY CLERK
CHAPTER 19 CITY FINANCE OFFICER
CHAPTER 20 CITY ATTORNEY
CHAPTER 21 CITY ADMINISTRATOR
CHAPTER 22 PARKS AND RECREATION BOARD
CHAPTER 23 PLANNING AND ZONING COMMISSION
CHAPTER 30 CONTRACT LAW ENFORCEMENT
CHAPTER 35 FIRE PROTECTION
CHAPTER 40 PUBLIC PEACE
CHAPTER 41 PUBLIC HEALTH AND SAFETY
CHAPTER 42 PUBLIC AND PRIVATE PROPERTY
CHAPTER 45 ALCOHOL CONSUMPTION AND INTOXICATION
CHAPTER 46 PARK REGULATIONS
CHAPTER 50 NUISANCE ABATEMENT PROCEDURE
CHAPTER 51 JUNK AND JUNK VEHICLES
CHAPTER 52 WEEDS AND GRASS
CHAPTER 55 ANIMAL PROTECTION AND CONTROL
CHAPTER 56 URBAN CHICKENS
CHAPTER 60 ADMINISTRATION OF TRAFFIC CODE
CHAPTER 61 TRAFFIC CONTROL DEVICES
CHAPTER 62 GENERAL TRAFFIC REGULATIONS
CHAPTER 63 SPEED REGULATIONS
CHAPTER 64 TURNING REGULATIONS
CHAPTER 65 STOP OR YIELD REQUIRED
CHAPTER 66 LOAD AND WEIGHT RESTRICTIONS
CHAPTER 67 PEDESTRIANS
CHAPTER 68 ONE-WAY TRAFFIC
CHAPTER 69 PARKING REGULATIONS
CHAPTER 70 TRAFFIC CODE ENFORCEMENT PROCEDURES
CHAPTER 75 ALL-TERRAIN VEHICLES AND SNOWMOBILES
CHAPTER 76 BICYCLE REGULATIONS
CHAPTER 77 GOLF CARTS
CHAPTER 80 ABANDONED VEHICLES
CHAPTER 90 WATER SERVICE SYSTEM
CHAPTER 91 CROSS CONNECTION CONTROL - CONTAINMENT PROVISIONS
CHAPTER 95 SANITARY SEWER SYSTEM
CHAPTER 96 BUILDING SEWERS AND CONNECTIONS
CHAPTER 97 USE OF PUBLIC SEWERS
CHAPTER 98 ON-SITE WASTEWATER SYSTEMS
CHAPTER 99 SEWER USE CHARGE SYSTEM
CHAPTER 100 REGULATION OF INDUSTRIAL WASTEWATER, COMMERCIAL WASTEWATER AND HAULED WASTE
CHAPTER 101 BENEFITED SEWER DISTRICTS
CHAPTER 105 SOLID WASTE CONTROL
CHAPTER 106 COLLECTION OF SOLID WASTE
CHAPTER 110 ELECTRIC FRANCHISE
CHAPTER 111 NATURAL GAS FRANCHISE
CHAPTER 120 LIQUOR LICENSES AND WINE AND BEER PERMITS
CHAPTER 121 CIGARETTE AND TOBACCO PERMITS
CHAPTER 122 PEDDLERS, SOLICITORS AND TRANSIENT MERCHANTS
CHAPTER 123 HOUSE MOVERS
CHAPTER 124 JUNKYARD LICENSING
CHAPTER 135 STREET USE AND MAINTENANCE
CHAPTER 136 SIDEWALK REGULATIONS
CHAPTER 137 VACATION AND DISPOSAL OF STREETS
CHAPTER 138 STREET GRADES
CHAPTER 139 NAMING OF STREETS
CHAPTER 150 TREES
CHAPTER 155 BUILDING REGULATIONS
CHAPTER 156 SWIMMING POOLS AND HOT TUBS
CHAPTER 157 DESIGN STANDARDS FOR PUBLIC IMPROVEMENTS
CHAPTER 158 WIND ENERGY CONVERSION SYSTEMS
CHAPTER 160 FLOOD PLAIN REGULATIONS
CHAPTER 165 ZONING REGULATIONS
CHAPTER 166 ARCHITECTURAL STANDARDS
CHAPTER 167 SIGN REGULATIONS
CHAPTER 170 SUBDIVISION REGULATIONS
CHAPTER 96
BUILDING SEWERS AND CONNECTIONS
 
96.01 Permit
96.05 Sewer Tap
96.02 Permit Fee and Connection Charge
96.06 Inspection Required
96.03 Plumber Required
96.07 Property Owner’s Responsibility
96.04 Connection Requirements
96.08 Abatement of Violations
 
96.01 PERMIT.
    No unauthorized person shall uncover, make any connection with or opening into, use, alter or disturb any public sewer or appurtenance thereof without first obtaining a written permit from the City. The application for the permit shall set forth the location and description of the property to be connected with the sewer system and the purpose for which the sewer is to be used, and shall be supplemented by any plans, specifications, or other information considered pertinent. The permit shall require the owner to complete construction and connection of the building sewer to the public sewer within 60 days after the issuance of the permit, except that when a property owner makes sufficient showing that due to conditions beyond the owner’s control or peculiar hardship, such time period is inequitable or unfair, an extension of time within which to comply with the provisions herein may be granted. Any sewer connection permit may be revoked at any time for a violation of these chapters.
96.02 PERMIT FEE AND CONNECTION CHARGE.
   The person who makes the application shall pay a fee in the amount of $20.00 to the Clerk to cover the cost of issuing the permit and supervising, regulating, and inspecting the work. In addition, there shall be a connection charge in the amount of $250.00 paid to reimburse the City for costs borne by the City in making sewer service available to the property served. This charge does not include the cost of installing a new septic tank, building sewer or pipe from the septic tank to the collection sewer, which shall be borne by the property owner.
Loading...