§ 14-405 BUILDING PERMIT.
   Persons placing a mobile home on any lot shall obtain a building permit from the City Building Inspector. A temporary permit as provided for in § 14-402(D) shall be obtained or renewed at a cost of $30 every six months. When city sewer is not available, an approved septic tank must be installed before mobile home is attached to the city water system and new or relocated mobile homes shall have separate water meters.
(1989 Code, § 14-405)